Skip to content
KAAN SONDAJ

Safety first, then metres

We apply the same health, safety, quality and environmental standards on every site.

A drill site combines rotating equipment, high pressure and heavy loads. All crews complete site-specific risk assessments and permit-to-work processes before starting.

Quality

Logs, core photos and test records are kept on standard forms; every delivery comes with traceable data.

Environment

Drilling fluids and waste are disposed of in a controlled way; sites are restored at handover.